IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0771 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $0 Implemented
UD0771 # 09 Y:2007 09 2007 DISCONNECT BALLASTS $304 $0 Implemented
UD0768 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $2,180 $0 Implemented
UD0768 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $860 $0 Implemented
UD0708 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $22,586 $0 Implemented
UD0708 # 05 Y:2004 05 2004 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $39,175 $120,100 Implemented
UD0708 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,459 $3,900 Implemented
UD0708 # 02 Y:2004 02 2004 DISCONNECT BALLASTS $53,161 $3,105 Implemented
UD0708 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,451 $0 Implemented
UD0708 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,678 $10,931 Implemented
UD0708 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,364 $20,952 Implemented
UD0666 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $21,034 $0 Implemented
UD0666 # 03 Y:2003 03 2003 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $14,700 $0 Implemented
UD0666 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,885 $0 Implemented
UD0666 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Implemented
UD0666 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,020 Implemented
UD0666 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,698 $0 Implemented
UD0666 # 16 Y:2003 16 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $175 $0 Implemented
UD0492 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $14,226 $6,000 Implemented
UD0492 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $7,030 Implemented
UD0492 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,723 $24,961 Implemented
UD0492 # 01 Y:1996 01 1996 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $552 $0 Implemented
UD0469 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $392 Implemented
UD0469 # 01 Y:1995 01 1995 COMBINE UTILITY METERS $3,256 $0 Implemented
UD0452 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,950 $0 Implemented