IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 3999 Manufacturing Industries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0123 # 09 Y:2013 09 2013 APPLY FOR INVESTMENT INCENTIVES $305 $0 Implemented
TT0123 # 07 Y:2013 07 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,774 $500 Implemented
TT0123 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $862 $50 Implemented
DL0100 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $20,000 Implemented
DL0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $3,500 Implemented
DL0100 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,275 $0 Implemented
DL0100 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,567 $100 Implemented
DL0100 # 07 Y:2013 07 2013 TREAT AND REUSE RINSE WATERS $7,121 $10,000 Implemented
UM0410 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,779 $100 Implemented
UA0083 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,259 $39,310 Implemented
MAS017 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,566 $10,000 Implemented
MAS016 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,510 $5,600 Implemented
MAS016 # 03 Y:2012 03 2012 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,910 $0 Implemented
OK0793 # 13 Y:2010 13 2010 UPGRADE CONTROLS ON COMPRESSORS $27,218 $30,300 Implemented
OK0793 # 12 Y:2010 12 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,071 $995 Implemented
OK0793 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $8,717 $17,813 Implemented
OK0793 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $88,705 $104,400 Implemented
UM0367 # 06 Y:2010 06 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,997 $68,395 Implemented
UM0367 # 14 Y:2010 14 2010 INSTALL STORM WINDOWS AND DOORS $171 $1,400 Implemented
UM0367 # 11 Y:2010 11 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,186 $7,500 Implemented
UM0367 # 07 Y:2010 07 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,317 $9,800 Implemented
UM0367 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,913 $2,000 Implemented
UM0367 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,074 $37,268 Implemented
UM0367 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,939 $500 Implemented
UM0367 # 13 Y:2010 13 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $277 $329 Implemented