IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,073

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0089 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,789 $11,754 Implemented
IP0089 # 10 Y:2017 10 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,079 $5,047 Implemented
WV0552 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $17,322 $2,500 Implemented
WV0552 # 05 Y:2017 05 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,424 $1,000 Implemented
WV0552 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,201 $10,486 Implemented
WV0552 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,913 $3,240 Implemented
MZ0232 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,891 $10,000 Implemented
UF0511 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,447 $20,214 Implemented
UF0511 # 06 Y:2017 06 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $495,807 $1,875,550 Implemented
WM0109 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,520 $0 Implemented
WM0109 # 10 Y:2017 10 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $394 $0 Implemented
WM0106 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,352 $3,278 Implemented
WM0106 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,204 $0 Implemented
WM0106 # 07 Y:2017 07 2017 USE OPTIMUM TEMPERATURE $1,605 $0 Implemented
WM0106 # 08 Y:2017 08 2017 USE RADIANT HEATER FOR SPOT HEATING $2,133 $3,818 Implemented
WM0106 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $1,138 $600 Implemented
WM0105 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $3,400 Implemented
SF0503 # 01 Y:2017 01 2017 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,497 $7,120 Implemented
SF0503 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123,711 $243,952 Implemented
SF0503 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $802,468 $1,600,000 Implemented
SF0503 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,530 $102,500 Implemented
SF0503 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,829 $29,980 Implemented
IC0193 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,158 $193,800 Implemented
IC0193 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,932 $14,716 Implemented
IC0193 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $1,847 Implemented