IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,073

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0197 # 06 Y:2022 06 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $130 $25 Implemented
UF0573 # 01 Y:2022 01 2022 USE EXISTING DAM TO GENERATE ELECTRICITY $223,605 $552,197 Implemented
UF0573 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $50,619 $45,817 Implemented
UF0573 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $35,580 $50,843 Implemented
UF0573 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $324,658 $1,232,000 Implemented
UF0573 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $35,912 $10,000 Implemented
UF0573 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $4,292 $0 Implemented
UF0571 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $72,351 $83,616 Implemented
UF0571 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,651 $18,000 Implemented
UF0571 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $22,414 $51,208 Implemented
UF0571 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $4,673 $5,569 Implemented
UF0571 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $65,277 $10,000 Implemented
UF0571 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $8,754 $0 Implemented
UF0570 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $61,494 $87,677 Implemented
UF0570 # 02 Y:2022 02 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $15,702 $33,667 Implemented
UF0570 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,945 $20,214 Implemented
UF0570 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,034 $32,610 Implemented
UF0570 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,674 $35,369 Implemented
UF0570 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $63,448 $10,000 Implemented
UF0570 # 09 Y:2022 09 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $7,481 $0 Implemented
NL0062 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,581 $24,336 Implemented
NL0062 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,498 $18,517 Implemented
NL0062 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,413 $660 Implemented
NL0062 # 07 Y:2022 07 2022 AIR CONDITION ONLY SPACE NECESSARY $424 $50,000 Implemented
AM0836 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $12,100 $11,315 Implemented