IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0796 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $634 $200 Implemented
MA0796 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $2,499 Implemented
MA0796 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,193 $200 Implemented
MA0790 # 08 Y:2018 08 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,934 $6,774 Implemented
MA0790 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,658 $25,350 Implemented
MA0790 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,372 $5,831 Implemented
MA0790 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,380 $500 Implemented
MA0790 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,345 $33,774 Implemented
MA0790 # 02 Y:2018 02 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $48,698 $124,000 Implemented
MA0763 # 05 Y:2016 05 2016 PAY UTILITY BILLS ON TIME $2,873 $500 Implemented
MA0763 # 06 Y:2016 06 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,753 $1,000 Implemented
MA0763 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,321 $5,078 Implemented
MA0763 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,953 $37,590 Implemented
MA0758 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $672 $500 Implemented
MA0758 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $917 $960 Implemented
MA0758 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,272 $1,450 Implemented
MA0758 # 02 Y:2016 02 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,464 $500 Implemented
MA0758 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,549 $2,836 Implemented
MA0722 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $998 $200 Implemented
MA0722 # 01 Y:2014 01 2014 USE POWER DURING OFF-PEAK PERIODS $11,298 $500 Implemented
MA0709 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $588 $200 Implemented