IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0849 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $9,300 $14,300 Implemented
AM0849 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,157 $360 Implemented
AM0849 # 03 Y:2022 03 2022 ADOPT IN-HOUSE MATERIAL GENERATION $15,440 $21,500 Not Implemented
AM0849 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,625 $37,000 Implemented
AM0849 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,395 $1,530 Not Implemented
AM0849 # 06 Y:2022 06 2022 PAY UTILITY BILLS ON TIME $344 $0 Implemented
AM0849 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $6,765 $560 Implemented
AM0849 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $830 Implemented
AM0849 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,245 $1,000 Implemented
AM0849 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $362 $30 Implemented
AM0849 # 11 Y:2022 11 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $71,703 $867,640 Not Implemented
MZ0325 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $113,192 $0 Implemented
MZ0325 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $56,407 $636,000 Not Implemented
MZ0325 # 03 Y:2022 03 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $224,497 $226,000 Not Implemented
MZ0325 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $50,371 $4,080 Implemented
CM1001 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,400 $14,000 Implemented
CM1001 # 02 Y:2022 02 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,550 $24,900 Not Implemented
CM1001 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $190 $1,100 Implemented
CM1001 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $3,950 Implemented
CM1001 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $1,100 $3,300 Not Implemented
OR0752 # 01 Y:2022 01 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,404 $321 Not Implemented
OR0752 # 02 Y:2022 02 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,067 $14,203 Not Implemented
OR0752 # 03 Y:2022 03 2022 SELL COMBUSTIBLE WASTE $482,170 $1,896,000 Not Implemented
AM0845 # 01 Y:2022 01 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $50,900 $9,100 Implemented
AM0845 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,965 $13,500 Implemented