IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 495 Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0523 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,300 $7,808 Implemented
AS0523 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,604 $200 Implemented
AS0523 # 01 Y:2022 01 2022 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $42,697 $89,337 Implemented
AS0523 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $2,695 Implemented
AS0523 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $381 $32 Implemented
AS0523 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $414 $328 Implemented
AS0520 # 02 Y:2022 02 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $296,800 $1,447,700 Implemented
AS0520 # 01 Y:2022 01 2022 RECOVER AND REUSE WASTE MATERIAL $3,163,484 $699,500 Implemented
AS0520 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,685 $19,485 Implemented
AS0509 # 06 Y:2021 06 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $231 Implemented
AS0509 # 05 Y:2021 05 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $634 $1,834 Implemented
AS0509 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $716 $2,286 Implemented
AS0509 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,608 $15,087 Implemented
AS0507 # 06 Y:2021 06 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,505 $943 Implemented
AS0507 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,284 $15,621 Implemented
AS0507 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $4,787 $2,803 Implemented
AS0501 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $7,546 Implemented
AS0501 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,080 $2,877 Implemented
AS0500 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,048 $811 Implemented
AS0500 # 05 Y:2021 05 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $718 $38 Implemented
AS0500 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,279 $1,850 Implemented
AS0500 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $8,113 Implemented
AS0496 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,262 $6,259 Implemented
AS0496 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,402 $3,920 Implemented
AS0496 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $2,587 $789 Implemented