IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,725

matching recommendations
Reset
SIC 495 Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0810 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,797 $625 Not Implemented
MA0810 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,310 $51,675 Not Implemented
MA0810 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,171 $2,500 Not Implemented
MA0810 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $934 $2,484 Implemented
OK1019 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,691 $0 Not Implemented
OK1019 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,794 $13,616 Not Implemented
OK1019 # 03 Y:2019 03 2019 USE POWER DURING OFF-PEAK PERIODS $4,239 $0 Implemented
OK1019 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $4,075 Implemented
UF0540 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $128,693 $34,812 Implemented
UF0540 # 02 Y:2019 02 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $99,716 $392,375 Implemented
UF0540 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,477 $20,256 Implemented
UF0540 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $32,246 $1,280 Implemented
UF0540 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,996 $0 Implemented
UF0540 # 06 Y:2019 06 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $18,214 $25,600 Implemented
AM0790 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,870 $29,400 Implemented
AM0790 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $4,100 $5,300 Implemented
AM0790 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,921 $12,100 Implemented
AM0790 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $415 $510 Implemented
AM0790 # 05 Y:2019 05 2019 USE PHOTOCELL CONTROLS $235 $17 Implemented
CL1915 # 01 Y:2019 01 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $47,547 $200,000 Not Implemented
CL1915 # 02 Y:2019 02 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,899 $5,500 Implemented
CL1915 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,751 $41,281 Implemented
CL1915 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,899 $0 Implemented
TR0018 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,196 $14,000 Not Implemented
TR0018 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,055 $1,825 Implemented