Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,725
matching recommendationsSIC | 495 | Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0083 # 06 Y:2023 | 06 | 2023 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $800 | $1,548 | Not Implemented |
NL0083 # 07 Y:2023 | 07 | 2023 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $200 | $2,040 | Implemented |
MA0862 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,262 | $30,900 | n/a |
MA0862 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,114 | $20,600 | n/a |
MA0862 # 03 Y:2023 | 03 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $24,241 | $55,000 | n/a |
MA0862 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,416 | $78,169 | n/a |
MA0862 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,461 | $14,400 | n/a |
MA0862 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,059 | $800 | n/a |
MA0862 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,570 | $2,160 | n/a |
MA0861 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $98,833 | $861,320 | n/a |
MA0861 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,846 | $17,375 | n/a |
MA0861 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,273 | $19,000 | n/a |
MA0861 # 04 Y:2023 | 04 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $7,254 | $18,500 | n/a |
MA0861 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,245 | $1,250 | n/a |
MA0860 # 01 Y:2023 | 01 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,991 | $1,650 | n/a |
MA0860 # 02 Y:2023 | 02 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,955 | $500 | n/a |
MA0860 # 03 Y:2023 | 03 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,588 | $5,500 | n/a |
IP0175 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM TEMPERATURE | $452 | $0 | Not Implemented |
IP0175 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $30,222 | $6,500 | Not Implemented |
IP0175 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $22,456 | $24,300 | Not Implemented |
MUWT02 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $98 | $20 | Not Implemented |
MUWT02 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $294 | $0 | Not Implemented |
MUWT02 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,399 | Not Implemented |
MZ0344 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,614 | $750 | Implemented |
MZ0344 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $1,547 | $1,000 | Implemented |