Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 4953 | Refuse Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0849 # 10 Y:2022 | 10 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $362 | $30 | Implemented |
AM0849 # 09 Y:2022 | 09 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,245 | $1,000 | Implemented |
AM0849 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $9,300 | $14,300 | Implemented |
AM0849 # 02 Y:2022 | 02 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,157 | $360 | Implemented |
AM0849 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,625 | $37,000 | Implemented |
AM0849 # 06 Y:2022 | 06 | 2022 | PAY UTILITY BILLS ON TIME | $344 | $0 | Implemented |
AM0849 # 07 Y:2022 | 07 | 2022 | REPAIR OR REPLACE STEAM TRAPS | $6,765 | $560 | Implemented |
AM0849 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $535 | $830 | Implemented |
WV0611 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,803 | $3,254 | Implemented |
WV0611 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,923 | $240 | Implemented |
WV0611 # 05 Y:2021 | 05 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,003 | $761 | Implemented |
WV0611 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,448 | $734 | Implemented |
WV0611 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $29 | Implemented |
UU0182 # 01 Y:2021 | 01 | 2021 | SELL COMBUSTIBLE WASTE | $358,314 | $840,585 | Implemented |
UU0182 # 06 Y:2021 | 06 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,360 | $920 | Implemented |
UU0182 # 02 Y:2021 | 02 | 2021 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $301,212 | $427,040 | Implemented |
CL2002 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,753 | $16,667 | Implemented |
CL2002 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $49,183 | $300,000 | Implemented |
CL2002 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $70,362 | $136,200 | Implemented |
AM0786 # 01 Y:2019 | 01 | 2019 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $55,800 | $67,044 | Implemented |
AM0786 # 05 Y:2019 | 05 | 2019 | USE SYNTHETIC LUBRICANT | $910 | $290 | Implemented |
AM0786 # 04 Y:2019 | 04 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,760 | $4,570 | Implemented |
AM0786 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,750 | $22,600 | Implemented |
AM0786 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $11,700 | $15,300 | Implemented |
SF0490 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,446 | $90 | Implemented |