IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 4953 Refuse Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0849 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $362 $30 Implemented
AM0849 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,245 $1,000 Implemented
AM0849 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $9,300 $14,300 Implemented
AM0849 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,157 $360 Implemented
AM0849 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,625 $37,000 Implemented
AM0849 # 06 Y:2022 06 2022 PAY UTILITY BILLS ON TIME $344 $0 Implemented
AM0849 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $6,765 $560 Implemented
AM0849 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $830 Implemented
WV0611 # 03 Y:2021 03 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,803 $3,254 Implemented
WV0611 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,923 $240 Implemented
WV0611 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $1,003 $761 Implemented
WV0611 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $2,448 $734 Implemented
WV0611 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $191 $29 Implemented
UU0182 # 01 Y:2021 01 2021 SELL COMBUSTIBLE WASTE $358,314 $840,585 Implemented
UU0182 # 06 Y:2021 06 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,360 $920 Implemented
UU0182 # 02 Y:2021 02 2021 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $301,212 $427,040 Implemented
CL2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,753 $16,667 Implemented
CL2002 # 03 Y:2020 03 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $49,183 $300,000 Implemented
CL2002 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $70,362 $136,200 Implemented
AM0786 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,800 $67,044 Implemented
AM0786 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $910 $290 Implemented
AM0786 # 04 Y:2019 04 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,760 $4,570 Implemented
AM0786 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,750 $22,600 Implemented
AM0786 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $11,700 $15,300 Implemented
SF0490 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,446 $90 Implemented