Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 4953 | Refuse Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0611 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $29 | Implemented |
WV0611 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $1,213 | Not Implemented |
WV0611 # 06 Y:2021 | 06 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $830 | $4,080 | Not Implemented |
WV0611 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,803 | $3,254 | Implemented |
WV0611 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,448 | $734 | Implemented |
WV0611 # 05 Y:2021 | 05 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,003 | $761 | Implemented |
MZ0304 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $466 | $250 | Not Implemented |
MZ0304 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $22,541 | $0 | Not Implemented |
MZ0304 # 02 Y:2021 | 02 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,323 | $185,555 | Not Implemented |
MZ0304 # 01 Y:2021 | 01 | 2021 | USE EXISTING DAM TO GENERATE ELECTRICITY | $83,325 | $120,377 | Not Implemented |
UU0182 # 04 Y:2021 | 04 | 2021 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,301 | $172,000 | Not Implemented |
UU0182 # 03 Y:2021 | 03 | 2021 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $94,872 | $621,000 | Not Implemented |
UU0182 # 06 Y:2021 | 06 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,360 | $920 | Implemented |
UU0182 # 01 Y:2021 | 01 | 2021 | SELL COMBUSTIBLE WASTE | $358,314 | $840,585 | Implemented |
UU0182 # 02 Y:2021 | 02 | 2021 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $301,212 | $427,040 | Implemented |
UU0182 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $5,611 | $2,229 | Not Implemented |
CL2002 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,753 | $16,667 | Implemented |
CL2002 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $70,362 | $136,200 | Implemented |
CL2002 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $49,183 | $300,000 | Implemented |
AM0786 # 01 Y:2019 | 01 | 2019 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $55,800 | $67,044 | Implemented |
AM0786 # 05 Y:2019 | 05 | 2019 | USE SYNTHETIC LUBRICANT | $910 | $290 | Implemented |
AM0786 # 04 Y:2019 | 04 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,760 | $4,570 | Implemented |
AM0786 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,750 | $22,600 | Implemented |
AM0786 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $11,700 | $15,300 | Implemented |
OR0721 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,383 | $7,807 | Not Implemented |