IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
SIC 4953 Refuse Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0304 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $466 $250 Not Implemented
MZ0304 # 02 Y:2021 02 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $16,323 $185,555 Not Implemented
MZ0304 # 03 Y:2021 03 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $22,541 $0 Not Implemented
MZ0304 # 01 Y:2021 01 2021 USE EXISTING DAM TO GENERATE ELECTRICITY $83,325 $120,377 Not Implemented
UU0182 # 06 Y:2021 06 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,360 $920 Implemented
UU0182 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $5,611 $2,229 Not Implemented
UU0182 # 02 Y:2021 02 2021 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $301,212 $427,040 Implemented
UU0182 # 01 Y:2021 01 2021 SELL COMBUSTIBLE WASTE $358,314 $840,585 Implemented
UU0182 # 04 Y:2021 04 2021 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $69,301 $172,000 Not Implemented
UU0182 # 03 Y:2021 03 2021 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $94,872 $621,000 Not Implemented
CL2002 # 03 Y:2020 03 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $49,183 $300,000 Implemented
CL2002 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $70,362 $136,200 Implemented
CL2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,753 $16,667 Implemented
AM0786 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $11,700 $15,300 Implemented
AM0786 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $910 $290 Implemented
AM0786 # 04 Y:2019 04 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,760 $4,570 Implemented
AM0786 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,750 $22,600 Implemented
AM0786 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,800 $67,044 Implemented
OR0721 # 01 Y:2019 01 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $40,539 $84,752 Not Implemented
OR0721 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,383 $7,807 Not Implemented
OR0721 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,615 $5,884 Not Implemented
OR0721 # 04 Y:2019 04 2019 REDUCE HEAT GAIN BY WINDOW TINTING $1,700 $12,122 Not Implemented
WM0111 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $135,557 $350,000 Not Implemented
WM0111 # 03 Y:2017 03 2017 USE SYNTHETIC LUBRICANT $30,600 $7,500 Not Implemented
WM0111 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,084 $45,000 Not Implemented