IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,021

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 07 Y:2020 07 2020 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $438 $0 Implemented
MI0380 # 01 Y:2020 01 2020 USE SOLAR HEAT TO HEAT WATER $17,031 $8,409 Implemented
MI0380 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,433 $12,201 Implemented
MI0380 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $11,460 Implemented
MI0380 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $2,753 $3,280 Implemented
MI0380 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,175 $1,980 Implemented
MI0380 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $568 $120 Implemented
NC0657 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $194 $493 Implemented
NC0657 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,082 $5,265 Implemented
AS0501 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,005 $7,546 Implemented
AS0501 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,080 $2,877 Implemented
AS0500 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,048 $811 Implemented
AS0500 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $8,113 Implemented
AS0500 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,279 $1,850 Implemented
AS0500 # 05 Y:2021 05 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $718 $38 Implemented
CL2017 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $206 $230 Implemented
CL2017 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,804 $2,100 Implemented
CL2017 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,387 $0 Implemented
CL2017 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,006 $789 Implemented
LE0499 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,388 $0 Implemented
LE0499 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,271 $5,600 Implemented
UF0556 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $33,420 $174,290 Implemented
UF0556 # 03 Y:2020 03 2020 INSTALL SKYLIGHTS $2,253 $4,190 Implemented