IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,681

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0671 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $3,901 $6,364 Implemented
WV0671 # 08 Y:2024 08 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,623 $1,200 Implemented
WV0671 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $3,020 $1,180 Implemented
WV0671 # 12 Y:2024 12 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $799 $1,648 Implemented
WV0671 # 13 Y:2024 13 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $176 Implemented
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 Implemented
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 Implemented
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 Implemented
UF0622 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,035 $0 Implemented
MUCM24 # 01 Y:2024 01 2024 USE OPTIMUM TEMPERATURE $419 $0 Implemented
MUCM24 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,029 $5,991 Implemented
MUCM24 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,693 $3,000 Implemented
MUCM24 # 05 Y:2024 05 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,516 $527 Implemented
MUCM24 # 06 Y:2024 06 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $332 $1,021 Implemented
DL0244 # 01 Y:2024 01 2024 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $6,357 $1,000 Implemented
DL0244 # 02 Y:2024 02 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,768 $0 Implemented
MUCM23 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,246 $3,407 Implemented
MUCM23 # 02 Y:2024 02 2024 KEEP EQUIPMENT CLEAN $89 $0 Implemented
MUCM23 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $58 $0 Implemented
MUCM23 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,319 $3,640 Implemented
MUCM23 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14 $32 Implemented
MUCM23 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,898 $0 Implemented
MZ0366 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,395 $800 Implemented
MZ0366 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,674 $14,000 Implemented
MZ0366 # 04 Y:2024 04 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,668 $59,968 Implemented