IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,843

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0130 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $759 $700 Not Implemented
NC0130 # 06 Y:1997 06 1997 REPAIR AND ELIMINATE STEAM LEAKS $72,505 $200 Not Implemented
NC0130 # 10 Y:1997 10 1997 REDUCE EXCESSIVE BOILER BLOWDOWN $1,000 $0 Not Implemented
UD0532 # 01 Y:1997 01 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,469 $0 Implemented
UD0532 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $15,018 Implemented
UD0532 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,422 $637 Not Implemented
UD0532 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $2,000 Implemented
UD0532 # 06 Y:1997 06 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,335 $5,000 Implemented
UD0532 # 07 Y:1997 07 1997 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,100 $20,000 Not Implemented
UD0533 # 01 Y:1997 01 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $508 $0 Implemented
UD0533 # 02 Y:1997 02 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,468 $200 Implemented
UD0533 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $2,564 Implemented
UD0533 # 04 Y:1997 04 1997 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $352 $50 Implemented
UD0533 # 05 Y:1997 05 1997 UPGRADE CONTROLS ON COMPRESSORS $553 $750 Implemented
UD0533 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,574 $20,000 Not Implemented
UD0533 # 08 Y:1997 08 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101 $50 Implemented
TN0621 # 01 Y:1997 01 1997 INSTALL TIMERS AND/OR THERMOSTATS $24,470 $4,300 Not Implemented
TN0621 # 03 Y:1997 03 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $14,220 $27,690 Not Implemented
TN0621 # 05 Y:1997 05 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,980 $17,100 Not Implemented
TN0621 # 06 Y:1997 06 1997 OPTIMIZE PLANT POWER FACTOR $5,710 $17,000 Not Implemented
TN0621 # 07 Y:1997 07 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,400 $0 Not Implemented
GT0629 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,784 $2,500 Implemented
GT0629 # 02 Y:1997 02 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $525 $150 Implemented
GT0629 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,595 $5,050 Not Implemented
GT0629 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $402 $965 Implemented