IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,846

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0075 # 08 Y:2012 08 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,048 $930 Not Implemented
UD0849 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,282 $15,816 Not Implemented
UD0849 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,445 $0 Not Implemented
UD0849 # 03 Y:2012 03 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,632 $0 Not Implemented
UD0849 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,199 $500 Not Implemented
UD0849 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,530 $1,000 Not Implemented
UD0849 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,045 $44,000 Not Implemented
UD0849 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,241 $11,000 Not Implemented
UD0849 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,274 $2,000 Not Implemented
NC0443 # 01 Y:2012 01 2012 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $24,834 $105,200 Not Implemented
NC0443 # 02 Y:2012 02 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,610 $27,000 Not Implemented
NC0443 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,514 $500 Not Implemented
NC0443 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,960 $10,175 Not Implemented
NC0443 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $633 $2,440 Not Implemented
NC0443 # 06 Y:2012 06 2012 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $28,327 $96,000 Not Implemented
MAS015 # 01 Y:2012 01 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,716 $4,442 Not Implemented
MAS015 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,906 $9,000 Not Implemented
MAS015 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,535 $3,900 Not Implemented
CO0654 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $8,050 $1,440 Implemented
CO0654 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,130 $1,990 Implemented
CO0654 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $570 $820 Implemented
CO0654 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,900 $17,990 Implemented
MA0687 # 01 Y:2012 01 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $50,722 $198,500 Not Implemented
MA0687 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,773 $12,025 Not Implemented
MA0687 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,724 $45,500 Implemented