IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,949

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0034 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $275 Implemented
LE0479 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $310 Not Implemented
LE0479 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,431 $9,000 Not Implemented
LE0479 # 03 Y:2019 03 2019 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $20,437 $22,500 Not Implemented
LE0479 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,667 $6,000 Not Implemented
LE0479 # 05 Y:2019 05 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,469 $3,500 Not Implemented
LE0479 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $34 $105 Not Implemented
LE0479 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,351 $15,513 Implemented
LE0479 # 08 Y:2019 08 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,624 $75,000 Not Implemented
TT0225 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,037 $53,169 Not Implemented
TT0225 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,576 $3,500 Not Implemented
TT0225 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $3,390 Not Implemented
IC0219 # 01 Y:2019 01 2019 REPLACE BOILER $68,168 $25,600 Not Implemented
IC0219 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,480 $17,728 Not Implemented
IC0219 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,919 $737 Not Implemented
WV0581 # 01 Y:2019 01 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $128,494 $314,600 Not Implemented
WV0581 # 02 Y:2019 02 2019 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $37,537 $5,500 Not Implemented
WV0581 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,868 $78,000 Implemented
WV0581 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,233 $58,107 Implemented
WV0581 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $9,387 $4,000 Implemented
WV0581 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $4,849 $738 Implemented
WV0581 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $100 Implemented
WV0581 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $938 $0 Implemented
LS1908 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,210 $0 Implemented
LS1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,386 $25,000 Implemented