IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0336 # 02 Y:1999 02 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,750 $0 Implemented
AM0336 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $640 $800 Not Implemented
AM0336 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $100 Implemented
AM0336 # 05 Y:1999 05 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $460 $0 Not Implemented
AM0336 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $290 $14 Not Implemented
AM0336 # 07 Y:1999 07 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $135 $0 Not Implemented
ME0257 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,536 $21,031 Implemented
ME0257 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $7,900 $1,000 Implemented
ME0257 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,980 $6,797 Implemented
ME0257 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $2,268 $879 Implemented
ME0257 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
ME0257 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $702 $300 Implemented
ME0257 # 08 Y:1999 08 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $671 $1,960 Not Implemented
TN0647 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,040 $500 Not Implemented
TN0647 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $0 Implemented
OR0337 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $44,432 $21,400 Not Implemented
OR0337 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,060 $0 Implemented
OR0337 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $9,949 $13,663 Implemented
OR0338 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $9,244 $1,831 Not Implemented
OR0338 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $11,400 $12,250 Not Implemented
OR0338 # 06 Y:1999 06 1999 USE OPTIMUM THICKNESS INSULATION $1,900 $1,810 Not Implemented
ME0256 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,108 $11,800 Not Implemented
ME0256 # 02 Y:1999 02 1999 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,700 $900 Implemented
ME0256 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $2,500 Implemented
ME0256 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $512 $185 Implemented