IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,838

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0214 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $910 Implemented
UD0215 # 01 Y:1987 01 1987 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,028 $0 Implemented
UD0215 # 02 Y:1987 02 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $662 $140 Implemented
UD0215 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $265 $300 Implemented
LT0059 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $1,810 $260 Implemented
LT0059 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $657 $85 Implemented
LT0059 # 04 Y:1986 04 1986 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $741 $1,440 Implemented
LT0066 # 02 Y:1986 02 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,230 $12,000 Implemented
LT0073 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $760 $0 Implemented
LT0078 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $980 $0 Implemented
LT0078 # 02 Y:1986 02 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,621 $2,905 Implemented
LT0078 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $703 $300 Implemented
LT0078 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $1,676 $0 Implemented
LT0078 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,298 $2,158 Implemented
KU0206 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,289 $5,696 Implemented
KU0206 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,313 $107 Implemented
KU0206 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,935 $1,500 Implemented
KU0206 # 08 Y:1986 08 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $474 $0 Implemented
KU0206 # 10 Y:1986 10 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $239 $0 Implemented
KU0206 # 11 Y:1986 11 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $183 $100 Implemented
KU0206 # 12 Y:1986 12 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
KU0207 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,525 $0 Implemented
KU0207 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,480 $0 Implemented
KU0207 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $9,165 $1,494 Implemented
KU0207 # 06 Y:1986 06 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,637 $6,030 Implemented