IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,884

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0712 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $259 $1,000 Implemented
UF0356 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,843 $21,108 Implemented
UF0356 # 03 Y:2005 03 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,348 $2,000 Implemented
UF0356 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,008 $700 Implemented
UF0356 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,295 $2,194 Implemented
UF0356 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,232 $1,450 Implemented
UF0356 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $245 Implemented
UM0275 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,025 $1,800 Implemented
UM0275 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,898 $500 Implemented
UM0275 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,883 $3,000 Implemented
UM0275 # 08 Y:2005 08 2005 AIR CONDITION ONLY SPACE NECESSARY $4,727 $50 Implemented
UM0275 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,909 $1,000 Implemented
MA0570 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $27,226 $1,624 Implemented
MA0570 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,028 $21,736 Implemented
MA0570 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,127 $30,357 Implemented
MA0570 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,365 $0 Implemented
MA0570 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,708 $7,000 Implemented
MA0570 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $600 Implemented
SD0356 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $5,391 $11,000 Implemented
SD0356 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,992 $14,000 Implemented
SD0356 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,351 $120 Implemented
WV0308 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,560 $110 Implemented
WV0308 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,364 $3,520 Implemented
WV0308 # 03 Y:2005 03 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,526 $714 Implemented
WV0308 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $2,037 $124 Implemented