IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,865

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0163 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,513 $12,290 Implemented
SD0163 # 02 Y:1997 02 1997 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,303 $0 Implemented
SD0163 # 03 Y:1997 03 1997 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $27,336 $4,000 Implemented
SD0163 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,545 $38,000 Implemented
SD0163 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,307 $1,800 Implemented
SD0163 # 06 Y:1997 06 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,941 $9,500 Implemented
SD0163 # 07 Y:1997 07 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,325 $1,127 Implemented
SD0163 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,455 $1,250 Implemented
HO0144 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,645 $4,563 Implemented
HO0144 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,903 $1,800 Implemented
UF0169 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,231 $555 Implemented
UF0169 # 02 Y:1997 02 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,538 $333 Implemented
UF0169 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,439 $1,850 Implemented
UF0170 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,266 $620 Implemented
UF0170 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $481 $882 Implemented
UF0170 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,872 $1,507 Implemented
UF0170 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $1,550 Implemented
UF0170 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,054 $0 Implemented
AM0291 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $3,100 $5,630 Implemented
AM0291 # 05 Y:1997 05 1997 REPAIR AND ELIMINATE STEAM LEAKS $1,980 $210 Implemented
AM0291 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,860 $780 Implemented
AM0291 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,060 $500 Implemented
AM0291 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $25 Implemented
AR0108 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,303 $415 Implemented
AR0108 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $560 $186 Implemented