IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,820

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0105 # 01 Y:1998 01 1998 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $56,890 $175,200 Implemented
OD0105 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,837 $38,044 Implemented
OD0105 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,120 $5,907 Implemented
ME0234 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,482 $4,476 Implemented
ME0234 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $500 Implemented
ME0234 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,979 $12,932 Implemented
ME0234 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,284 $800 Implemented
ME0234 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,153 $10,580 Implemented
UL0212 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,802 $100 n/a
UL0212 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $3,040 $2,176 n/a
MA0423 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,279 $80,000 Not Implemented
MA0423 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $585 $2,627 Implemented
MA0423 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,343 $234 Implemented
MA0423 # 01 Y:1998 01 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,806 $300 Implemented
MA0423 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $149 $257 Not Implemented
MA0423 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $187 $294 Not Implemented
MA0423 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,841 $2,700 Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
HO0175 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,263 $16,755 Implemented
HO0175 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $500 Not Implemented
HO0175 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,201 $168 Implemented
HO0175 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $800 $300 Implemented
UL0211 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,780 $0 n/a