IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,610

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0448 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $600 Implemented
BD0448 # 15 Y:2014 15 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,650 $30,000 Implemented
BD0444 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,722 $300 Implemented
BD0443 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,592 $225 Implemented
BD0443 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,323 $11,250 Implemented
BD0443 # 09 Y:2014 09 2014 SHUT OFF PILOTS IN STANDBY EQUIPMENT $175 $40 Implemented
BD0441 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,813 $2,600 Implemented
BD0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $280 Implemented
BD0441 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,765 $3,000 Implemented
BD0441 # 07 Y:2014 07 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,000 $900 Implemented
BD0441 # 08 Y:2014 08 2014 CHANGE OPERATING CONDITIONS $1,402 $30 Implemented
BD0439 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,296 $50 Implemented
BD0439 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,900 $1,000 Implemented
BD0439 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $813 $795 Implemented
BD0439 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $20 Implemented
BD0439 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $341 $350 Implemented
BD0438 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $257,500 $315,000 Implemented
BD0438 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $63,332 $57,300 Implemented
BD0438 # 04 Y:2013 04 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $52,832 $150,000 Implemented
BD0438 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,432 $30 Implemented
BD0438 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,324 $10,000 Implemented
BD0438 # 07 Y:2013 07 2013 REPAIR OR REPLACE STEAM TRAPS $42,432 $1,600 Implemented
BD0438 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $19,230 $25,000 Implemented
BD0438 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,466 $20,000 Implemented
BD0438 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,975 $34,500 Implemented