Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0495 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $1,860 | $500 | Implemented |
CO0495 # 03 Y:2001 | 03 | 2001 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $470 | $500 | Implemented |
CO0495 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $250 | $0 | Implemented |
CO0495 # 05 Y:2001 | 05 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $9,900 | $1,000 | Implemented |
CO0494 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,000 | $12,000 | Not Implemented |
CO0494 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,820 | $250 | Implemented |
CO0494 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,090 | $800 | Not Implemented |
CO0494 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $80 | $199 | Implemented |
CO0494 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $380 | $0 | Implemented |
CO0493 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,290 | $23,430 | Implemented |
CO0493 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,500 | $21,650 | Not Implemented |
CO0493 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,500 | $6,270 | Implemented |
CO0493 # 04 Y:2001 | 04 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,960 | $6,500 | Implemented |
CO0493 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,290 | $360 | Implemented |
CO0493 # 06 Y:2001 | 06 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $7,270 | $8,240 | Not Implemented |
CO0492 # 01 Y:2001 | 01 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,100 | $1,470 | Not Implemented |
CO0492 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,010 | $8,660 | Not Implemented |
CO0492 # 03 Y:2001 | 03 | 2001 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $4,980 | $29,800 | Not Implemented |
CO0492 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,040 | $6,460 | Implemented |
CO0492 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,280 | $2,060 | Not Implemented |
CO0492 # 06 Y:2001 | 06 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,160 | $3,610 | Not Implemented |
CO0492 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Not Implemented |
CO0491 # 01 Y:2001 | 01 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $20,780 | $61,010 | Implemented |
CO0491 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,820 | $4,110 | Not Implemented |
CO0491 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,740 | $570 | Implemented |