IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0495 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,860 $500 Implemented
CO0495 # 03 Y:2001 03 2001 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $470 $500 Implemented
CO0495 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $0 Implemented
CO0495 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,900 $1,000 Implemented
CO0494 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,000 $12,000 Not Implemented
CO0494 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,820 $250 Implemented
CO0494 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,090 $800 Not Implemented
CO0494 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $80 $199 Implemented
CO0494 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $0 Implemented
CO0493 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,290 $23,430 Implemented
CO0493 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,500 $21,650 Not Implemented
CO0493 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,500 $6,270 Implemented
CO0493 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,960 $6,500 Implemented
CO0493 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,290 $360 Implemented
CO0493 # 06 Y:2001 06 2001 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $7,270 $8,240 Not Implemented
CO0492 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,100 $1,470 Not Implemented
CO0492 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,010 $8,660 Not Implemented
CO0492 # 03 Y:2001 03 2001 USE SOLAR HEAT TO HEAT MAKE-UP AIR $4,980 $29,800 Not Implemented
CO0492 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,040 $6,460 Implemented
CO0492 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,280 $2,060 Not Implemented
CO0492 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,160 $3,610 Not Implemented
CO0492 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Not Implemented
CO0491 # 01 Y:2001 01 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $20,780 $61,010 Implemented
CO0491 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $10,820 $4,110 Not Implemented
CO0491 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $570 Implemented