IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0090 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,097 $1,800 Implemented
DS0090 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,210 $1,910 Implemented
DS0090 # 03 Y:1997 03 1997 COVER OPEN TANKS $634 $242 Not Implemented
DS0090 # 04 Y:1997 04 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,937 $20,000 Implemented
DS0090 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,196 $32,400 Not Implemented
DS0090 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,735 $9,500 Implemented
DS0090 # 07 Y:1997 07 1997 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $13,750 $19,000 Implemented
DS0090 # 08 Y:1997 08 1997 $70,200 $65,000 Implemented
DS0091 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $886 $900 Not Implemented
DS0091 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $3,234 $882 Implemented
DS0091 # 03 Y:1997 03 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $121,380 $250,000 Implemented
DS0091 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $760 $800 Not Implemented
DS0091 # 05 Y:1997 05 1997 USE OTHER WASTE CONCENTRATION METHODS $1,784 $10,000 Not Implemented
DS0091 # 06 Y:1997 06 1997 REDUCE DELIVERY SCHEDULES $71,460 $50,000 Implemented
DS0088 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,136 $75 Implemented
DS0088 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $5,126 Not Implemented
DS0088 # 03 Y:1997 03 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $28,000 $4,500 Implemented
DS0088 # 04 Y:1997 04 1997 $82,160 $340 Not Implemented
DS0089 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $7,041 $1,750 Implemented
DS0089 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $296 $450 Not Implemented
DS0089 # 03 Y:1997 03 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,298 $1,100 Implemented
DS0089 # 04 Y:1997 04 1997 FILTER AND REUSE HYDRAULIC OIL $670 $0 Not Implemented
DS0089 # 05 Y:1997 05 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $8,273 $7,500 Not Implemented
DS0089 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,641 $2,315 Implemented
DS0087 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,061 $60 Implemented