IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

216

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0780 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,772 $500 Implemented
GT0780 # 07 Y:2004 07 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,729 $1,209 Implemented
GT0780 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,654 $10,261 Implemented
GT0780 # 12 Y:2004 12 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $2,490 $800 Implemented
GT0780 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,453 $900 Implemented
GT0780 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,020 $11,903 Implemented
GT0759 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $89,620 $108,930 Implemented
GT0759 # 07 Y:2003 07 2003 USE RADIANT HEATER FOR SPOT HEATING $5,960 $2,190 Implemented
GT0759 # 01 Y:2003 01 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,870 $3,000 Implemented
GT0759 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,765 $188,200 Implemented
GT0743 # 04 Y:2002 04 2002 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $10,781 $1,720 Implemented
GT0743 # 01 Y:2002 01 2002 USE MINIMUM STEAM OPERATING PRESSURE $1,259 $0 Implemented
GT0698 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $7,360 $3,240 Implemented
GT0698 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,389 $250 Implemented
GT0698 # 07 Y:2000 07 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,235 $1,800 Implemented
GT0698 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $59,243 $300,000 Implemented
GT0661 # 07 Y:1999 07 1999 $673,610 $245,000 Implemented
GT0661 # 02 Y:1999 02 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,938 $300 Implemented
GT0661 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $215,560 $112,500 Implemented
GT0640 # 08 Y:1998 08 1998 METER WASTE WATER $7,180 $8,000 Implemented
GT0640 # 02 Y:1998 02 1998 COMBINE UTILITY METERS $5,560 $0 Implemented
GT0640 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $28,530 $45,720 Implemented
GT0640 # 07 Y:1998 07 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,741 $7,900 Implemented
GT0640 # 04 Y:1998 04 1998 UPGRADE CONTROLS ON COMPRESSORS $7,000 $5,000 Implemented
GT0640 # 06 Y:1998 06 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,660 $5,675 Implemented