IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0213 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,122 $145 Implemented
IC0213 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,245 $9,440 Implemented
IC0204 # 02 Y:2018 02 2018 ADJUST PH FOR NEUTRALIZATION $132,488 $180,000 Implemented
IC0204 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $71,357 $8,712 Implemented
IC0204 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $71,958 $100,000 Implemented
IC0204 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $36,108 $187,206 Implemented
IC0204 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $21,223 $0 Implemented
IC0204 # 03 Y:2018 03 2018 REPLACE BOILER $97,199 $211,342 Implemented
IC0203 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,334 $12,088 Implemented
IC0203 # 01 Y:2018 01 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,150 $285,000 Implemented
IC0193 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $1,847 Implemented
IC0193 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,932 $14,716 Implemented
IC0193 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,158 $193,800 Implemented
IC0171 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,545 $345 Implemented
IC0171 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $324 $1 Implemented
IC0171 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,223 $99,311 Implemented
IC0163 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $635 $538 Implemented
IC0163 # 10 Y:2009 10 2009 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,689,703 $0 Implemented
IC0163 # 08 Y:2009 08 2009 RECYCLE WHITE WATER $2,034 $771 Implemented
IC0163 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $528 $332 Implemented
IC0163 # 07 Y:2009 07 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,925 $17,000 Implemented
IC0163 # 03 Y:2009 03 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,314 $102 Implemented
IC0149 # 10 Y:2008 10 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,263 $0 Implemented
IC0149 # 09 Y:2008 09 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $849 $0 Implemented
IC0149 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,594 $1,610 Implemented