Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
2,344
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0554 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,445 | $0 | Implemented |
KU0554 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,829 | $0 | Implemented |
KU0549 # 02 Y:2000 | 02 | 2000 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $2,132 | $3,172 | Implemented |
KU0547 # 03 Y:2000 | 03 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $680 | $200 | Implemented |
KU0547 # 02 Y:2000 | 02 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $630 | $0 | Implemented |
KU0546 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,500 | $1,000 | Implemented |
KU0546 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $870 | $740 | Implemented |
KU0545 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,020 | $0 | Implemented |
KU0545 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,890 | $20 | Implemented |
KU0545 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,420 | $15,470 | Implemented |
KU0545 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,580 | $1,150 | Implemented |
KU0545 # 06 Y:2000 | 06 | 2000 | COMBINE UTILITY METERS | $1,450 | $4,000 | Implemented |
KU0545 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,510 | $1,770 | Implemented |
KU0545 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $12,740 | $4,370 | Implemented |
KU0544 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,390 | $840 | Implemented |
KU0544 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $31,200 | $2,780 | Implemented |
KU0544 # 01 Y:2000 | 01 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,310 | $800 | Implemented |
KU0543 # 05 Y:2000 | 05 | 2000 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $420 | $100 | Implemented |
KU0543 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $50 | Implemented |
KU0543 # 01 Y:2000 | 01 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $27,200 | $0 | Implemented |
KU0542 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,010 | $330 | Implemented |
KU0542 # 04 Y:2000 | 04 | 2000 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,730 | $0 | Implemented |
KU0539 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM TEMPERATURE | $15,700 | $20,000 | Implemented |
KU0538 # 03 Y:2000 | 03 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,510 | $600 | Implemented |
KU0535 # 03 Y:1999 | 03 | 1999 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,870 | $1,250 | Implemented |