IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,361

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0547 # 02 Y:2000 02 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $630 $0 Implemented
KU0547 # 03 Y:2000 03 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $680 $200 Implemented
KU0545 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,890 $20 Implemented
KU0545 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $12,740 $4,370 Implemented
KU0545 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,150 Implemented
KU0545 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $15,470 Implemented
KU0545 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,450 $4,000 Implemented
KU0545 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,510 $1,770 Implemented
KU0545 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,020 $0 Implemented
KU0542 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $330 Implemented
KU0542 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,730 $0 Implemented
KU0538 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,510 $600 Implemented
KU0532 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,040 $20,000 Implemented
KU0532 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $360 Implemented
KU0532 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $450 Implemented
KU0532 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,060 $12,170 Implemented
KU0532 # 08 Y:1999 08 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,620 $800 Implemented
KU0524 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $750 $680 Implemented
KU0524 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,820 $3,790 Implemented
KU0524 # 01 Y:1999 01 1999 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,520 $18,350 Implemented
KU0524 # 06 Y:1999 06 1999 USE SYNTHETIC LUBRICANT $650 $1,160 Implemented
KU0524 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $1,270 Implemented
KU0524 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,110 $2,500 Implemented
KU0524 # 07 Y:1999 07 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $600 $0 Implemented
KU0522 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,170 $710 Implemented