Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
225
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0297 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,367 | $0 | Not Implemented |
KU0299 # 04 Y:1989 | 04 | 1989 | REPAIR OR REPLACE STEAM TRAPS | $8,388 | $450 | Implemented |
KU0298 # 11 Y:1989 | 11 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $120 | $0 | Implemented |
KU0298 # 03 Y:1989 | 03 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,572 | $100 | Implemented |
KU0299 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,205 | $2,400 | Not Implemented |
KU0299 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $421 | $121 | Implemented |
KU0298 # 10 Y:1989 | 10 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $361 | $0 | Implemented |
KU0296 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,973 | $5,262 | Implemented |
KU0296 # 02 Y:1989 | 02 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,025 | $1,690 | Implemented |
KU0295 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,066 | $0 | Implemented |
KU0296 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $620 | $0 | Implemented |
KU0295 # 07 Y:1989 | 07 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $120 | $200 | Not Implemented |
KU0295 # 08 Y:1989 | 08 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,182 | $500 | Implemented |
KU0295 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $576 | Implemented |
KU0295 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,793 | $3,300 | Implemented |
KU0296 # 01 Y:1989 | 01 | 1989 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,891 | $15,450 | Implemented |
KU0295 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,741 | $5,300 | Implemented |
KU0295 # 04 Y:1989 | 04 | 1989 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,301 | $150 | Implemented |
KU0295 # 06 Y:1989 | 06 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $238 | $200 | Not Implemented |
KU0293 # 04 Y:1989 | 04 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $345 | $0 | Not Implemented |
KU0294 # 06 Y:1989 | 06 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $526 | $200 | Implemented |
KU0294 # 04 Y:1989 | 04 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,153 | $4,100 | Implemented |
KU0294 # 03 Y:1989 | 03 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,667 | $8,200 | Not Implemented |
KU0294 # 02 Y:1989 | 02 | 1989 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,418 | $15,000 | Not Implemented |
KU0293 # 05 Y:1989 | 05 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,638 | $450 | Implemented |