IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0486 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,020 $2,980 Implemented
KU0486 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $12,940 $11,560 Implemented
KU0486 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $1,560 $1,150 Implemented
KU0486 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,990 $10,200 Implemented
KU0486 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,010 $790 Implemented
KU0486 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,710 $13,580 Implemented
KU0485 # 07 Y:1997 07 1997 METER WASTE WATER $230 $100 Implemented
KU0485 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $1,080 $1,180 Implemented
KU0485 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $470 $300 Implemented
KU0485 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $660 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented
KU0483 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,200 $270 Implemented
KU0483 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $80 Implemented
KU0483 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,820 $7,770 Implemented
KU0482 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,220 $15,180 Implemented
KU0482 # 09 Y:1997 09 1997 $50,000 $13,360 Implemented
KU0482 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,090 $12,000 Implemented
KU0482 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,350 $380 Implemented
KU0482 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,530 $410 Implemented
KU0482 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,850 $8,570 Implemented
KU0480 # 09 Y:1997 09 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,260 $1,050 Implemented
KU0480 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $480 Implemented
KU0480 # 06 Y:1997 06 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,780 $2,200 Implemented
KU0480 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,580 $12,900 Implemented
KU0480 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,900 $17,350 Implemented