Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
936
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0007 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $20,250 | $416 | Not Implemented |
LM0007 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $29,913 | $29,612 | Implemented |
LM0005 # 01 Y:2001 | 01 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $635 | $100 | Implemented |
LM0005 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $587 | $115 | Implemented |
LM0005 # 03 Y:2001 | 03 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $25,900 | $12,500 | Not Implemented |
LM0005 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,600 | $0 | Not Implemented |
LM0005 # 05 Y:2001 | 05 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $168,480 | $45,830 | Not Implemented |
LM0005 # 06 Y:2001 | 06 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $6,000 | $5,000 | Not Implemented |
LM0004 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $8,789 | $8,500 | Not Implemented |
LM0004 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,547 | $725 | Implemented |
LM0004 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $910 | $1,530 | Not Implemented |
LM0004 # 04 Y:2001 | 04 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,492 | $1,950 | Not Implemented |
LM0004 # 05 Y:2001 | 05 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $3,420 | $1,000 | Not Implemented |
LM0004 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $666 | $1,000 | Implemented |
LM0004 # 07 Y:2001 | 07 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $44,800 | $1,000 | Implemented |
LM0004 # 08 Y:2001 | 08 | 2001 | CLEAR AND RENT EXISTING SPACE | $240,000 | $25,000 | Not Implemented |
LM0003 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $1,651 | $4,100 | Not Implemented |
LM0003 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,862 | $0 | Implemented |
LM0003 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,731 | $460 | Implemented |
LM0003 # 04 Y:2001 | 04 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,824 | $0 | Implemented |
LM0003 # 05 Y:2001 | 05 | 2001 | MAINTAIN MACHINES TO REDUCE LEAKS | $750 | $350 | Implemented |
LM0003 # 06 Y:2001 | 06 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $7,268 | $1,500 | Not Implemented |
LM0002 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,192 | $3,285 | Not Implemented |
LM0002 # 02 Y:2001 | 02 | 2001 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,259 | $3,158 | Not Implemented |
LM0002 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,253 | $250 | Implemented |