Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,766
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0608 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,784 | $150 | Implemented |
MA0608 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,575 | $2,925 | Implemented |
MA0608 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $712 | $1,500 | Implemented |
MA0606 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130,688 | $6,000 | Implemented |
MA0605 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $17,280 | $975 | Implemented |
MA0605 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,515 | $0 | Implemented |
MA0605 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,754 | $525 | Implemented |
MA0604 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $20,912 | $14,335 | Implemented |
MA0604 # 04 Y:2006 | 04 | 2006 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $8,539 | $8,050 | Implemented |
MA0604 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,206 | $13,536 | Implemented |
MA0603 # 02 Y:2006 | 02 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $54,146 | $2,000 | Implemented |
MA0603 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,920 | $83,405 | Implemented |
MA0603 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,778 | $8,125 | Implemented |
MA0603 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,595 | $83,500 | Implemented |
MA0603 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,480 | $50,000 | Implemented |
MA0603 # 10 Y:2006 | 10 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,287 | $0 | Implemented |
MA0603 # 11 Y:2006 | 11 | 2006 | BURN WASTE OIL FOR HEAT | $3,685 | $6,500 | Implemented |
MA0603 # 14 Y:2006 | 14 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,402 | $0 | Implemented |
MA0603 # 15 Y:2006 | 15 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $874 | $4,000 | Implemented |
MA0603 # 16 Y:2006 | 16 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $650 | $4,000 | Implemented |
MA0603 # 17 Y:2006 | 17 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $172 | $0 | Implemented |
MA0602 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,335 | $96,992 | Implemented |
MA0602 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,691 | $749 | Implemented |
MA0602 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $8,388 | $4,050 | Implemented |
MA0602 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $1,122 | $950 | Implemented |