IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0752 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,599 $47,900 Implemented
MA0752 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,566 $37,930 Implemented
MA0751 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,219 $62,146 Implemented
MA0751 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,896 $7,732 Implemented
MA0751 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,586 $11,250 Implemented
MA0679 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $70,691 $20,000 Implemented
MA0679 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $24,174 $55,000 Implemented
MA0679 # 04 Y:2011 04 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,015 $30,000 Implemented
MA0679 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,785 $11,650 Implemented
MA0679 # 02 Y:2011 02 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $45,173 $20,100 Implemented
MA0679 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $12,376 $55,750 Implemented
MA0610 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,399 $10,600 Implemented
MA0610 # 02 Y:2007 02 2007 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,760 $7,600 Implemented
MA0610 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,743 $4,700 Implemented
MA0610 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $94 $100 Implemented
MA0594 # 01 Y:2006 01 2006 INSTALL TIMERS AND/OR THERMOSTATS $123,147 $15,525 Implemented
MA0594 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,354 $121,835 Implemented
MA0594 # 05 Y:2006 05 2006 REDUCE VENTILATION AIR $5,860 $3,505 Implemented
MA0594 # 06 Y:2006 06 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,046 $0 Implemented
MA0590 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,037 $56,931 Implemented
MA0590 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,603 $3,312 Implemented
MA0590 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $1,000 Implemented
MA0590 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $10,500 $2,000 Implemented
MA0590 # 10 Y:2006 10 2006 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $9,818 $6,420 Implemented
MA0559 # 03 Y:2004 03 2004 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $36,905 $15,475 Implemented