IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0774 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $4,135 $27,198 Not Implemented
MA0774 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,868 $652 Implemented
MA0774 # 05 Y:2017 05 2017 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,908 $1,775 Implemented
MA0773 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,653 $30,000 Not Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,564 $6,660 Not Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 06 Y:2017 06 2017 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $501 $100 Not Implemented
MA0772 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,553 $10,235 Not Implemented
MA0772 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,550 $7,200 Implemented
MA0772 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $1,069 $3,189 Not Implemented
MA0772 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $602 $20 Not Implemented
MA0772 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $300 Implemented
MA0772 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $499 $20 Implemented
MA0772 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $32 $144 Not Implemented
MA0771 # 01 Y:2017 01 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,141 $1,000 Implemented
MA0771 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $8,733 $3,480 Not Implemented
MA0771 # 03 Y:2017 03 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $527 $2,116 Implemented
MA0770 # 01 Y:2017 01 2017 REDUCE VENTILATION AIR $8,661 $1,503 Not Implemented
MA0770 # 02 Y:2017 02 2017 AIR CONDITION ONLY SPACE NECESSARY $2,351 $1,000 Not Implemented
MA0770 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $1,809 $2,784 Implemented
MA0770 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $286 $20 Not Implemented
MA0770 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $124 $100 Implemented
MA0769 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,487 $39,330 Implemented