IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0742 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,112 $4,285 Not Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
MA0741 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $131,224 $279,750 Not Implemented
MA0741 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $91,436 $5,000 Not Implemented
MA0741 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,787 $14,025 Not Implemented
MA0741 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,147 $29,732 Not Implemented
MA0741 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,279 $7,050 Not Implemented
MA0741 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,308 $2,775 Not Implemented
MA0740 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $426 $500 Implemented
MA0740 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,853 $200 Implemented
MA0740 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $5,057 $4,200 Implemented
MA0740 # 03 Y:2015 03 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,672 $11,200 Implemented
MA0740 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,745 $6,695 Implemented
MA0740 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $3,084 $2,450 Implemented
MA0740 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,904 $1,425 Implemented
MA0740 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,652 $5,375 Not Implemented
MA0740 # 08 Y:2015 08 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,775 $2,010 Implemented
MA0739 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,369 $11,834 Not Implemented
MA0739 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,543 $500 Implemented
MA0739 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $927 $1,570 Implemented
MA0739 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $880 $1,285 Implemented
MA0739 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $864 $2,635 Not Implemented
MA0739 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $915 Not Implemented
MA0739 # 07 Y:2015 07 2015 PAY UTILITY BILLS ON TIME $426 $500 Implemented
MA0738 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,139 $500 Implemented