Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0691 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $249 | $200 | Implemented |
MAS023 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,820 | $44,000 | Implemented |
MAS023 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,502 | $7,500 | Implemented |
MAS023 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,970 | $8,500 | Implemented |
MAS023 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,899 | $9,580 | Implemented |
MAS023 # 05 Y:2012 | 05 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,978 | $3,000 | Not Implemented |
MAS023 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,575 | $3,130 | Not Implemented |
MAS023 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $596 | $0 | Implemented |
MAS022 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $19,167 | $20,900 | Implemented |
MAS022 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,821 | $2,600 | Implemented |
MAS022 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,186 | $4,660 | Implemented |
MAS022 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Implemented |
MAS020 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,764 | $7,000 | Implemented |
MAS020 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,617 | $60,000 | Not Implemented |
MAS020 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,203 | $7,700 | Not Implemented |
MAS020 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,667 | $11,600 | Implemented |
MAS020 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESS STEAM BLEEDING | $1,611 | $500 | Implemented |
MAS021 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $99,334 | $216,000 | Not Implemented |
MAS021 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $36,978 | $9,000 | Not Implemented |
MAS021 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,123 | $77,100 | Not Implemented |
MAS021 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,077 | $8,000 | Implemented |
MAS021 # 05 Y:2012 | 05 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,883 | $3,120 | Implemented |
MAS021 # 06 Y:2012 | 06 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,590 | $3,120 | Implemented |
MAS021 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,154 | $2,000 | Not Implemented |
MA0689 # 01 Y:2012 | 01 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $85,000 | $250,000 | Implemented |