IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0691 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $249 $200 Implemented
MAS023 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,820 $44,000 Implemented
MAS023 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,502 $7,500 Implemented
MAS023 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $8,500 Implemented
MAS023 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,899 $9,580 Implemented
MAS023 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,978 $3,000 Not Implemented
MAS023 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,575 $3,130 Not Implemented
MAS023 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $596 $0 Implemented
MAS022 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $19,167 $20,900 Implemented
MAS022 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,821 $2,600 Implemented
MAS022 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,186 $4,660 Implemented
MAS022 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $875 $0 Implemented
MAS020 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,764 $7,000 Implemented
MAS020 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,617 $60,000 Not Implemented
MAS020 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,203 $7,700 Not Implemented
MAS020 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,667 $11,600 Implemented
MAS020 # 05 Y:2012 05 2012 REDUCE EXCESS STEAM BLEEDING $1,611 $500 Implemented
MAS021 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $99,334 $216,000 Not Implemented
MAS021 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $36,978 $9,000 Not Implemented
MAS021 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,123 $77,100 Not Implemented
MAS021 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,077 $8,000 Implemented
MAS021 # 05 Y:2012 05 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,883 $3,120 Implemented
MAS021 # 06 Y:2012 06 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,590 $3,120 Implemented
MAS021 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,154 $2,000 Not Implemented
MA0689 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $85,000 $250,000 Implemented