Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,929
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0444 # 06 Y:1999 | 06 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $3,766 | $0 | Not Implemented |
MA0441 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,168 | $5,704 | Implemented |
MA0441 # 02 Y:1999 | 02 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $43,200 | $3,000 | Implemented |
MA0441 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,964 | $40,000 | Not Implemented |
MA0441 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,069 | $26,625 | Not Implemented |
MA0441 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $789 | $0 | Implemented |
MA0441 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $632 | $2,250 | Implemented |
MA0440 # 01 Y:1999 | 01 | 1999 | CHANGE OPERATING CONDITIONS | $29,415 | $130,900 | Not Implemented |
MA0440 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,896 | $15,790 | Implemented |
MA0440 # 03 Y:1999 | 03 | 1999 | CHANGE OPERATING CONDITIONS | $2,562 | $27,140 | Not Implemented |
MA0440 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,444 | $3,400 | Implemented |
MA0440 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,278 | $5,204 | Implemented |
MA0440 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,349 | $70,000 | Not Implemented |
MA0440 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $709 | $1,245 | Implemented |
MA0440 # 08 Y:1999 | 08 | 1999 | MINIMIZE WATER USAGE | $6,136 | $10,000 | Not Implemented |
MA0442 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $186,395 | $900,000 | Not Implemented |
MA0442 # 02 Y:1999 | 02 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $73,450 | $125,600 | Not Implemented |
MA0442 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,396 | $38,500 | Implemented |
MA0442 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,380 | $11,544 | Implemented |
MA0442 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $2,575 | Implemented |
MA0442 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $402 | $955 | Implemented |
MA0442 # 07 Y:1999 | 07 | 1999 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $257 | $640 | Implemented |
MA0439 # 01 Y:1999 | 01 | 1999 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $120,000 | $24,000 | Not Implemented |
MA0439 # 02 Y:1999 | 02 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,636 | $1,360 | Implemented |
MA0439 # 03 Y:1999 | 03 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,629 | $500 | Implemented |