Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,498
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0305 # 06 Y:2000 | 06 | 2000 | AUTOMATE FINISHING PROCESS | $15,000 | $41,800 | Implemented |
ME0305 # 05 Y:2000 | 05 | 2000 | MINIMIZE WATER USAGE | $325 | $225 | Implemented |
ME0305 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $187 | $350 | Not Implemented |
ME0305 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $366 | $357 | Implemented |
ME0305 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $1,193 | Implemented |
ME0305 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,013 | $340 | Implemented |
ME0304 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,835 | $4,434 | Implemented |
ME0304 # 04 Y:2000 | 04 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,848 | $0 | Implemented |
ME0304 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $152 | $384 | Not Implemented |
ME0304 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,300 | $3,542 | Not Implemented |
ME0304 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,601 | $3,600 | Not Implemented |
ME0303 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $252,792 | $97,800 | Not Implemented |
ME0303 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,880 | $44,850 | Not Implemented |
ME0303 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $11,195 | $4,080 | Not Implemented |
ME0303 # 05 Y:2000 | 05 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $184,216 | $324,000 | Not Implemented |
ME0303 # 06 Y:2000 | 06 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $480,000 | $0 | Not Implemented |
ME0303 # 04 Y:2000 | 04 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $631,036 | $1,864,500 | Not Implemented |
ME0302 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,862 | $9,010 | Not Implemented |
ME0302 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,620 | $42,550 | Not Implemented |
ME0302 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,137 | $6,000 | Not Implemented |
ME0302 # 04 Y:2000 | 04 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $879,619 | $2,084,500 | Not Implemented |
ME0302 # 05 Y:2000 | 05 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $1,000,000 | $0 | Not Implemented |
ME0301 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,743 | $35,073 | Not Implemented |
ME0301 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $7,500 | $3,600 | Not Implemented |
ME0301 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,427 | $27,427 | Not Implemented |