Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
195
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0305 # 05 Y:2000 | 05 | 2000 | MINIMIZE WATER USAGE | $325 | $225 | Implemented |
ME0305 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $366 | $357 | Implemented |
ME0305 # 06 Y:2000 | 06 | 2000 | AUTOMATE FINISHING PROCESS | $15,000 | $41,800 | Implemented |
ME0305 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $1,193 | Implemented |
ME0305 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,013 | $340 | Implemented |
ME0305 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $187 | $350 | Not Implemented |
ME0304 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $152 | $384 | Not Implemented |
ME0304 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,835 | $4,434 | Implemented |
ME0304 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,300 | $3,542 | Not Implemented |
ME0304 # 04 Y:2000 | 04 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,848 | $0 | Implemented |
ME0304 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,601 | $3,600 | Not Implemented |
ME0303 # 06 Y:2000 | 06 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $480,000 | $0 | Not Implemented |
ME0303 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,880 | $44,850 | Not Implemented |
ME0303 # 04 Y:2000 | 04 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $631,036 | $1,864,500 | Not Implemented |
ME0303 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $11,195 | $4,080 | Not Implemented |
ME0303 # 05 Y:2000 | 05 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $184,216 | $324,000 | Not Implemented |
ME0303 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $252,792 | $97,800 | Not Implemented |
ME0302 # 05 Y:2000 | 05 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $1,000,000 | $0 | Not Implemented |
ME0302 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,620 | $42,550 | Not Implemented |
ME0302 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,137 | $6,000 | Not Implemented |
ME0302 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,862 | $9,010 | Not Implemented |
ME0302 # 04 Y:2000 | 04 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $879,619 | $2,084,500 | Not Implemented |
ME0301 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,427 | $27,427 | Not Implemented |
ME0301 # 06 Y:2000 | 06 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $5,000 | $15,000 | Not Implemented |
ME0301 # 04 Y:2000 | 04 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,346 | $7,200 | Not Implemented |