IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,670

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0106 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $862 Implemented
MI0106 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,390 $56 Implemented
MI0106 # 06 Y:2005 06 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $834 $600 Not Implemented
MI0106 # 07 Y:2005 07 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $756 $1,536 Not Implemented
MI0105 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $81,540 $120,000 Not Implemented
MI0105 # 02 Y:2005 02 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $44,261 $320 Not Implemented
MI0105 # 03 Y:2005 03 2005 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $26,325 $32,000 Not Implemented
MI0105 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,112 $0 Not Implemented
MI0105 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,381 $14,100 Not Implemented
MI0105 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $4,619 $0 Not Implemented
MI0104 # 01 Y:2005 01 2005 HEAT WATER WITH EXHAUST HEAT $315,984 $128,000 Not Implemented
MI0104 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,384 $1,300 Not Implemented
MI0104 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,889 $600 Not Implemented
MI0104 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,821 $3,010 Not Implemented
MI0104 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,246 $10,198 Not Implemented
MI0104 # 06 Y:2005 06 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,160 $5,060 Not Implemented
MI0103 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $61,700 $195,000 Not Implemented
MI0103 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,798 $906 Not Implemented
MI0103 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,613 $6,960 Not Implemented
MI0103 # 04 Y:2005 04 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,062 $1,536 Not Implemented
MI0103 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $288 Not Implemented
MI0103 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $556 $486 Not Implemented
MI0102 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,313 $40,224 Not Implemented
MI0102 # 02 Y:2005 02 2005 $66,212 $29,320 Not Implemented
MI0102 # 03 Y:2005 03 2005 $23,325 $1,104 Not Implemented