Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0285 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,338 | $2,880 | Implemented |
MZ0285 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,668 | $1,820 | Implemented |
MZ0285 # 06 Y:2019 | 06 | 2019 | USE COMPRESSOR AIR FILTERS | $1,546 | $360 | Implemented |
MZ0282 # 08 Y:2019 | 08 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $53,310 | $16,200 | Implemented |
MZ0282 # 09 Y:2019 | 09 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,909 | $680 | Implemented |
MZ0282 # 01 Y:2019 | 01 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $586 | $472 | Implemented |
MZ0282 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,721 | $7,200 | Implemented |
MZ0278 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $45,917 | $2,907 | Implemented |
MZ0278 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $902,475 | $6,762,500 | Implemented |
MZ0278 # 02 Y:2019 | 02 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $382,507 | $601,250 | Implemented |
MZ0278 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $42,284 | $13,051 | Implemented |
MZ0278 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $176,232 | $3,250 | Implemented |
MZ0278 # 04 Y:2019 | 04 | 2019 | REDUCE SCRAP PRODUCTION | $126,263 | $207,500 | Implemented |
MZ0278 # 09 Y:2019 | 09 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,558 | $870 | Implemented |
MZ0278 # 10 Y:2019 | 10 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,709 | $200 | Implemented |
MZ0279 # 05 Y:2019 | 05 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,719 | $14,400 | Implemented |
MZ0279 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,031 | $4,700 | Implemented |
MZ0279 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $428 | $1,464 | Implemented |
MZ0279 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,014 | $640 | Implemented |
MZ0279 # 07 Y:2019 | 07 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $19,835 | $25,600 | Implemented |
MZ0279 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,794 | $6,252 | Implemented |
MZ0277 # 09 Y:2019 | 09 | 2019 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $409 | $1,200 | Implemented |
MZ0277 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,816 | $3,021 | Implemented |
MZ0277 # 07 Y:2019 | 07 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $70,665 | $233,814 | Implemented |
MZ0277 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $55,889 | $160 | Implemented |