IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,985

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0199 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,516 $1,070 Not Implemented
NC0199 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $351 $102 Not Implemented
NC0199 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,352 $210 Implemented
NC0199 # 06 Y:2000 06 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,140 $0 Implemented
NC0199 # 07 Y:2000 07 2000 INSTALL COMMON HEADER ON COMPRESSORS $26,946 $118,000 Not Implemented
NC0192 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,843 $10,160 Not Implemented
NC0192 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,718 $50,100 Not Implemented
NC0192 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,432 $3,250 Implemented
NC0192 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $87,421 $288,000 Not Implemented
NC0192 # 05 Y:2000 05 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $20,845 $10,000 Not Implemented
NC0195 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $150,957 $214,000 Implemented
NC0195 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,306 $300 Implemented
NC0195 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $7,600 $6,350 Implemented
NC0195 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,637 $7,260 Not Implemented
NC0195 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,839 $3,180 Implemented
NC0195 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,675 $50 Not Implemented
NC0195 # 07 Y:2000 07 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,632 $7,499 Not Implemented
NC0193 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,710 Not Implemented
NC0193 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $3,831 $3,617 Implemented
NC0193 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,422 $56 Not Implemented
NC0193 # 04 Y:2000 04 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,211 $3,850 Not Implemented
NC0193 # 05 Y:2000 05 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,491 $500 Not Implemented
NC0193 # 06 Y:2000 06 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $64,272 $64,142 Not Implemented
NC0193 # 07 Y:2000 07 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $23,000 $1,000 Not Implemented
NC0194 # 01 Y:2000 01 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $429 $835 Implemented