Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0076 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,481 | $25,000 | Not Implemented |
NL0076 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $42,345 | $20,000 | Not Implemented |
NL0070 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $854 | Implemented |
NL0070 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $675 | $3,315 | Implemented |
NL0070 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,590 | $23,500 | Implemented |
NL0070 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,030 | $4,945 | Not Implemented |
NL0070 # 04 Y:2022 | 04 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,619 | $1,180 | Not Implemented |
NL0070 # 03 Y:2022 | 03 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,148 | $35 | Implemented |
NL0070 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $32,832 | $16,500 | Implemented |
NL0070 # 01 Y:2022 | 01 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $41,224 | $20,136 | Not Implemented |
NL0064 # 01 Y:2022 | 01 | 2022 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $79,442 | $292,000 | Implemented |
NL0064 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,251 | $1,729 | Implemented |
NL0064 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,248 | $2,875 | Implemented |
NL0064 # 05 Y:2022 | 05 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $331 | $90 | Implemented |
NL0064 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $204 | $130 | Implemented |
NL0064 # 04 Y:2022 | 04 | 2022 | USE HIGH PRESSURE WASH SYSTEMS | $768 | $240 | Implemented |
NL0030 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $421 | Implemented |
NL0030 # 02 Y:2019 | 02 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,716 | $22,557 | Implemented |
NL0030 # 01 Y:2019 | 01 | 2019 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $12,000 | $102,830 | Not Implemented |
NL0017 # 02 Y:2018 | 02 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,800 | $2,000 | Implemented |
NL0017 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,615 | $60,000 | Implemented |
NL0017 # 03 Y:2018 | 03 | 2018 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,784 | $275 | Not Implemented |
NL0016 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $47,000 | $4,500 | Not Implemented |
NL0016 # 08 Y:2018 | 08 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,200 | $0 | Not Implemented |
NL0016 # 07 Y:2018 | 07 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,600 | $90,000 | Not Implemented |