IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0131 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $327 $0 Implemented
NV0131 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $50 Implemented
NV0127 # 10 Y:1999 10 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,343 $325 Implemented
NV0127 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $704 $1,500 Implemented
NV0127 # 04 Y:1999 04 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,768 $588 Implemented
NV0127 # 08 Y:1999 08 1999 USE RADIANT HEATER FOR SPOT HEATING $3,636 $4,525 Implemented
NV0124 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,858 $7,243 Implemented
NV0124 # 06 Y:1999 06 1999 $93,148 $0 Implemented
NV0121 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,107 $12,275 Implemented
NV0121 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,198 $0 Implemented
NV0119 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,884 $48,211 Implemented
NV0119 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,499 $0 Implemented
NV0118 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,834 $3,260 Implemented
NV0118 # 05 Y:1998 05 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,870 $0 Implemented
NV0118 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $2,663 $3,333 Implemented
NV0118 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $180 Implemented
NV0117 # 02 Y:1998 02 1998 $25,175 $82,000 Implemented
NV0117 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,032 $1,000 Implemented
NV0117 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $242 $252 Implemented
NV0116 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $808 $200 Implemented
NV0116 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $0 Implemented
NV0115 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $1,772 $2,333 Implemented
NV0115 # 04 Y:1998 04 1998 $68,996 $19,100 Implemented
NV0115 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,937 $10,398 Implemented
NV0113 # 03 Y:1998 03 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $278,123 $520,000 Implemented