IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0678 # 01 Y:2016 01 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $4,885 $2,948 Not Implemented
OR0678 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,663 $247 Implemented
OR0678 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $972 $2,626 Implemented
OR0677 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $7,372 $5,408 Implemented
OR0677 # 02 Y:2016 02 2016 USE OPTIMUM TEMPERATURE $1,822 $300 Not Implemented
OR0677 # 03 Y:2016 03 2016 REPLACE BOILER $4,164 $17,322 Not Implemented
OR0677 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,583 $22,256 Not Implemented
OR0677 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,064 $658 Implemented
OR0677 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $944 Not Implemented
OR0676 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,742 $0 Not Implemented
OR0676 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,729 $6,828 Not Implemented
OR0676 # 03 Y:2016 03 2016 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $216,607 $80,000 Implemented
OR0676 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,774 $7,200 Implemented
OR0676 # 05 Y:2016 05 2016 ADD AREA LIGHTING SWITCHES $1,356 $1,062 Implemented
OR0676 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $2,884 $6,584 Implemented
OR0672 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,924 $26,614 Not Implemented
OR0672 # 02 Y:2016 02 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $21,014 $35,396 Not Implemented
OR0672 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,775 $138,248 Not Implemented
OR0671 # 01 Y:2016 01 2016 ELIMINATE/REDUCE AN OPERATION $357,967 $669,217 Not Implemented
OR0671 # 02 Y:2016 02 2016 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $190,362 $300,000 Not Implemented
OR0671 # 03 Y:2016 03 2016 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $24,528 $1,495 Not Implemented
OR0671 # 04 Y:2016 04 2016 REDESIGN PROCESS $4,005 $3,500 Not Implemented
OR0671 # 05 Y:2016 05 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,295 $1,000 Implemented
OR0670 # 01 Y:2016 01 2016 REDUCE FLUID FLOW RATES $244,946 $880,000 Not Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented