IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0601 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,167 $2,000 Not Implemented
OR0601 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $1,616 Not Implemented
OR0601 # 05 Y:2013 05 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $51,858 $112,345 Not Implemented
OR0601 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,546 $5,306 Implemented
OR0601 # 07 Y:2013 07 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,479 $35,500 Not Implemented
OR0601 # 08 Y:2013 08 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,164 $8,104 Implemented
OR0600 # 01 Y:2012 01 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,559 $2,500 Not Implemented
OR0600 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,704 $500 Implemented
OR0600 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $334 $0 Implemented
OR0600 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $392 Implemented
OR0600 # 05 Y:2012 05 2012 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $4,720 $0 Not Implemented
OR0600 # 06 Y:2012 06 2012 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $6,653 $385 Implemented
OR0600 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,399 $560 Implemented
OR0600 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,835 $2,724 Implemented
OR0599 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,611 $12,467 Implemented
OR0599 # 02 Y:2012 02 2012 INSTALL AUTOMATIC PACKING EQUIPMENT $35,308 $0 Implemented
OR0599 # 03 Y:2012 03 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,422 $0 Not Implemented
OR0599 # 04 Y:2012 04 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,409 $0 Implemented
OR0599 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $1,964 $17,576 Not Implemented
OR0598 # 01 Y:2012 01 2012 RECYCLE CASTING SAND $437,377 $71,170 Not Implemented
OR0598 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $2,289 $1,015 Not Implemented
OR0598 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,034 $1,534 Not Implemented
OR0597 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,480 $9,480 Implemented
OR0597 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,834 $41,834 Not Implemented
OR0597 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,892 $11,892 Not Implemented