IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,097

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0661 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $1,989 $170 Implemented
OR0661 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,575 $3,600 Not Implemented
OR0661 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,783 $2,340 Not Implemented
OR0660 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $135,000 $250,000 Implemented
OR0660 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $3,310 $8,500 Implemented
OR0660 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,283 $1,500 Implemented
OR0660 # 04 Y:2015 04 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $8,242 $54,525 Not Implemented
OR0659 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,705 $20,000 Implemented
OR0659 # 02 Y:2015 02 2015 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $26,260 $7,200 Implemented
OR0659 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $906 $900 Not Implemented
OR0659 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $6,192 $8,000 Implemented
OR0659 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $4,259 $5,617 Not Implemented
OR0659 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,165 $3,410 Not Implemented
OR0659 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $1,353 $8,000 Implemented
OR0659 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,463 $0 Not Implemented
OR0655 # 01 Y:2015 01 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,151 $0 Not Implemented
OR0655 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,161 $1,000 Implemented
OR0655 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $20,211 $1,000 Not Implemented
OR0655 # 04 Y:2015 04 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $175,008 $188,400 Not Implemented
OR0655 # 05 Y:2015 05 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $15,571 $19,050 Not Implemented
OR0655 # 06 Y:2015 06 2015 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $180,695 $251,760 Not Implemented
OR0655 # 07 Y:2015 07 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $51,916 $126,000 Not Implemented
OR0655 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,958 $7,816 Not Implemented
OR0655 # 09 Y:2015 09 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $2,480 $20,979 Not Implemented
OR0654 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,067,158 $300,000 Implemented