Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0360 # 03 Y:1999 | 03 | 1999 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $6,248 | $20,000 | Not Implemented |
OR0360 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $18,785 | $67,680 | Not Implemented |
OR0360 # 05 Y:1999 | 05 | 1999 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $17,520 | $2,000 | Implemented |
OR0360 # 01 Y:1999 | 01 | 1999 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $9,585 | $2,840 | Implemented |
OR0360 # 02 Y:1999 | 02 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,909 | $0 | Implemented |
OR0359 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,648 | $9,500 | Not Implemented |
OR0359 # 02 Y:1999 | 02 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,013 | $0 | Implemented |
OR0359 # 04 Y:1999 | 04 | 1999 | OPTIMIZE PLANT POWER FACTOR | $786 | $2,200 | Not Implemented |
OR0359 # 05 Y:1999 | 05 | 1999 | COMBINE UTILITY METERS | $1,851 | $10,000 | Not Implemented |
OR0359 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $80,000 | $95,000 | Not Implemented |
OR0358 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $0 | $3,600 | Not Implemented |
OR0358 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $860 | $17,000 | Not Implemented |
OR0358 # 04 Y:1999 | 04 | 1999 | ELIMINATE A BY-PRODUCT | $9,905 | $2,000 | Implemented |
OR0358 # 02 Y:1999 | 02 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $2,574 | $12,750 | Not Implemented |
OR0357 # 02 Y:1999 | 02 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $91,000 | $95,000 | Not Implemented |
OR0357 # 03 Y:1999 | 03 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $2,800 | $7,000 | Not Implemented |
OR0357 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $423,000 | $140,000 | Not Implemented |
OR0357 # 05 Y:1999 | 05 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,150 | $0 | Implemented |
OR0357 # 04 Y:1999 | 04 | 1999 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $198,470 | $500,000 | Not Implemented |
OR0357 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,621 | $4,800 | Implemented |
ORS005 # 02 Y:1999 | 02 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $403,875 | $572,000 | Not Implemented |
ORS005 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $55,755 | $0 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |
ORS005 # 11 Y:1999 | 11 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,489 | $6,220 | Not Implemented |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |