Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,248
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0218 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $20,301 | $8,000 | Not Implemented |
TT0218 # 05 Y:2019 | 05 | 2019 | INCREASE AMOUNT OF CONDENSATE RETURNED | $5,090 | $15,000 | Implemented |
TT0218 # 06 Y:2019 | 06 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,670 | $200 | Implemented |
TT0218 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,000 | $2,000 | Implemented |
TT0218 # 08 Y:2019 | 08 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,058 | $4,500 | Not Implemented |
TT0218 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $1,202 | $2,400 | Implemented |
TT0218 # 10 Y:2019 | 10 | 2019 | ELIMINATE/REDUCE AN OPERATION | $798 | $340 | Implemented |
TT0214 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $223,429 | $3,000 | Implemented |
TT0214 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $64,974 | $152,490 | Not Implemented |
TT0214 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $24,664 | $106,000 | Not Implemented |
TT0214 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,330 | $66,000 | Not Implemented |
TT0214 # 05 Y:2019 | 05 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,715 | $75,000 | Not Implemented |
TT0214 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,401 | $5,000 | Implemented |
TT0214 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,443 | $15,674 | Not Implemented |
TT0212 # 01 Y:2018 | 01 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $76,685 | $250,172 | Not Implemented |
TT0212 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,776 | $32,000 | Implemented |
TT0212 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,707 | $330,000 | Not Implemented |
TT0212 # 04 Y:2018 | 04 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $38,635 | $13,000 | Implemented |
TT0212 # 05 Y:2018 | 05 | 2018 | METER WASTE WATER | $34,128 | $1,900 | Implemented |
TT0212 # 06 Y:2018 | 06 | 2018 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,427 | $79,168 | Not Implemented |
TT0212 # 07 Y:2018 | 07 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,248 | $34,845 | Not Implemented |
TT0212 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,795 | $16,665 | Not Implemented |
TT0212 # 09 Y:2018 | 09 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,775 | $5,000 | Implemented |
TT0212 # 10 Y:2018 | 10 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $2,270 | $1,720 | Not Implemented |
TT0212 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $283 | $250 | Implemented |