IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0884 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $936 $500 Implemented
UD0884 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,058 $500 Implemented
UD0884 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,400 $19,000 Implemented
UD0873 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $680 $1,050 Implemented
UD0873 # 01 Y:2013 01 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,346 $0 Implemented
UD0873 # 07 Y:2013 07 2013 USE RADIANT HEATER FOR SPOT HEATING $1,809 $0 Implemented
UD0873 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $1,443 $2,400 Implemented
UD0873 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,732 $9,904 Implemented
UD0873 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $23,496 $50,000 Implemented
UD0827 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $995 $500 Implemented
UD0827 # 07 Y:2010 07 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $597 $50 Implemented
UD0797 # 09 Y:2009 09 2009 DISCONNECT BALLASTS $858 $0 Implemented
UD0797 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,489 $48,750 Implemented
UD0797 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,034 $1,000 Implemented
UD0788 # 01 Y:2008 01 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $49,954 $12,500 Implemented
UD0788 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $0 Implemented
UD0788 # 10 Y:2008 10 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $590 $0 Implemented
UD0788 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $2,123 $3,500 Implemented
UD0788 # 06 Y:2008 06 2008 AIR CONDITION ONLY SPACE NECESSARY $13,860 $0 Implemented
UD0788 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,385 $440 Implemented
UD0788 # 09 Y:2008 09 2008 UPGRADE CONTROLS ON COMPRESSORS $1,037 $200 Implemented
UD0788 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $26,537 $21,250 Implemented
UD0782 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $5,748 $6,528 Implemented
UD0782 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,245 $0 Implemented
UD0782 # 06 Y:2008 06 2008 ADD AREA LIGHTING SWITCHES $3,233 $10,000 Implemented